灌注桩桩底后注浆效果分析与改进建议  

Analysis and Improvement on grouting effects of Bored Pile

在线阅读下载全文

作  者:卢莹先 

机构地区:[1]福建工大工程咨询监理有限公司,福建福州350008

出  处:《福建建筑》2011年第9期52-54,共3页Fujian Architecture & Construction

摘  要:分析福州市某高程建筑后注浆冲孔灌注桩的施工与检测资料,指出对强透水卵石土层实施注浆时,掺加速凝剂对提高基桩承载力的重要作用。并提出根据岩土层的透水性确定注浆水灰比、采用循环注浆管道系统以便正确地控制注浆压力、以及对长而大的冲钻孔灌注桩按规范的专门规定确定单桩承载力等建议。Based on the data of construction record and on-site inspection of post-grouting punching perfusion pile of a high rise building in Fuzhou,the grouting effect of flash-setting agent on highly permeable layer is evaluated.Water to cement ratio(W/C) of grouting is determined by permeability of rock and soil bed,grouting pressure is controlled by rotative piping systems,and some advice on assessing load-carrying capacity of pile is proposed for longer boring cast-in-situ pile.

关 键 词:冲孔灌注桩 强透水层 后注浆 速凝剂 成果判释 

分 类 号:U443.154[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象