检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜美武
出 处:《浙江水利水电专科学校学报》2011年第3期28-31,共4页Journal of Zhejiang Water Conservancy and Hydropower College
摘 要:通过对小水电站低压水轮发电机预防性试验开展情况的调研,指出在具体实际试验中,缺乏针对性依据、不利于现场实施等方面所存在的问题.结合实际案例,就低压发电机预防性试验的一般项目、检测周期、检测要求、试验结果评价等展开分析、论证,提出了切实可行的观点及解决方法,并作出补充性建议参考标准.进一步促进小水电发电机预防性试验技术水平.The existing problems in actual test are pointed out in the paper, combined with the investigation on preventive testing of low pressure turbine generator in small hydropower stations. The aspects concerned with the preventive test for low voltage generator, such as regular projects, test cycle, detection requirements, test result evaluation and so on are analyzed and discussed based on the actual cases, and practical ideas and solutions are also put forward for reference in order to promote the preventive testing technology for small hydropower generators.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33