检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:行舟[1] 陈永华[2] 陈振寰[1] 李晓虎[1] 梁磊[2] 陈征[2]
机构地区:[1]甘肃电力调度通信中心,甘肃省兰州市730050 [2]国网电力科学研究院/南京南瑞集团公司,江苏省南京市210003
出 处:《电力系统自动化》2011年第20期20-23,102,共5页Automation of Electric Power Systems
摘 要:针对中国风电调度运行现状、存在的问题及风电场有功控制现状,提出了大型集群风电有功智能控制系统的控制策略。介绍了该策略的总体思路与框架、控制模式、异常处理等,设计了2种风电场间的协调控制方法,即最大出力控制方法和出力跟踪控制方法。该策略在甘肃电网的实际应用结果证明了其可行性。In view of the present situation and problems existing in China's wind power operation,as well as the status quo of wind farms active power control,a control strategy is proposed for large cluster of wind farms active power intelligent control system.The overall concepts and framework,the control models and exceptional conditions handling strategy are introduced.The two coordination control methods,i.e.the maximum output control method and the output tracking control method are designed for the wind farms.Results of applying the strategy proposed to the actual operation in Gansu power grid prove its feasibility.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15