检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]常州工学院数学系,江苏常州213002 [2]上海第二工业大学管理工程研究所,上海201209
出 处:《系统工程学报》2011年第5期649-655,共7页Journal of Systems Engineering
基 金:国家自然科学基金资助项目(70731160015);江苏省自然科学基金资助项目(yw06037)
摘 要:研究工件排序与转包相联的模型,即制造商从客户处接受一批工件,这些工件既可以由制造商加工,也可以一定费用转包给承包商加工.制造商需要确定被转包的工件集及工件的加工顺序,使得加工费用和转包费用之和为最小.研究制造商为平行机及自由作业,承包商为单机情况下的排序与转包模型,基于动态规划算法给出了近似算法,并分析了该算法的性能比.This paper studies models on scheduling with subcontracting options under parallel and open-shop machines. In the models a manufacturer receives a set of jobs from its customers at the beginning of the planning horizon. Each job can be either processed by manufacturer's machines in-house or subcontracted to subcontractor's machines at costs. The manufacturer needs to determine which orders should be produced in-house and which orders should be subcontracted. Furthermore, it needs to determine a production sched- ule for all orders. The objective is to minimize the sum of production and subcontracting cost. Based on the dynamic programming algorithm, a approximate algorithm with worst-case performance analysis is given for the problems under manufacturer's parallel and open shop machines and subcontractor's single machine respectively.
分 类 号:O224[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166