检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴世泽[1] 房艳国[1] 李茂华[1] 詹莉[1] 刘培培[1]
机构地区:[1]长江三峡勘测研究院有限公司,湖北武汉430074
出 处:《资源环境与工程》2011年第5期499-502,共4页Resources Environment & Engineering
摘 要:2011年3月10日云南盈江发生5.8级地震,大盈江防护堤县城段的地震烈度为8度,造成大盈江堤防工程震损长达38.4 km,经对区域地震地质、堤基地质条件和震损特征综合分析,认为大盈江堤防处在近南北向和北东向断层带交汇处,地震震动是外因,堤基为粉细砂,是变形的内因。为确保汛期安全和施工方便,提出了裂缝部位采用常规的抽槽回填碾压处理,管涌严重地段采取堤外压盖碎石土,堤内抛石护脚的方法进行处理。为中国堤防工程应急处置积累经验。On March 10th,2011,a Ms 5.8 earthquake struck Yingjiang County,Yunnan Province.The seismic intensity of Yingjiang Embankment Project near Yingjiang County is 8 degrees.About 38.4 kilometers of embankment was damaged during the earthquake.Based on the comprehensive analysis of regional seismic,geological conditions and seismic damage characteristics,a conclusion is drawn that the Yingjiang Embankment Project is located at the intersection between north-south and north-east fault zones,seismic tremor is the external cause,and fine sand foundation is the internal cause.To guarantee the safety of life and property and to facilitate the construction,some measures are applied.The cracks of the embankment can be processed by the conventional replacement and rolling compaction,while the piping leakage of the embankment can be processed by covering gravelly soil outside the embankment and revetting with rubble inside the embankment.The measures accumulate experience for emergency disposal of embankment project in the Nation.
分 类 号:TV871[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229