苗尾水电站心墙防渗土料压实质量检测方法及控制标准  被引量:5

Study on Compaction Quality Test Methods and Control Standards of Impervious Core Earth Material for Miaowei Dam

在线阅读下载全文

作  者:李朝政[1] 李伟[1] 陈江[1] 

机构地区:[1]中国水电顾问集团昆明勘测设计研究院科学研究分院,云南昆明650033

出  处:《水力发电》2011年第10期51-53,共3页Water Power

摘  要:高土质心墙堆石坝采用砾质土作为心墙防渗料已成为发展趋势,砾质土的压实质量是施工控制的重点。目前常用于大坝防渗料填筑施工压实效果检测的几种控制方法的对比分析表明,采用三点击实法检测粒径小于20mm细料的压实度作为控制标准,全料的压实度作为复核标准是合适的。用优选的压实度检测方法对苗尾水电站防渗土料进行了碾压试验,并提出了其压实度控制标准的建议。Using gravel soil as impervious core material for high rock-fill dams with earth core wall is becoming popular, and the compaction quality of gravel soil is the key of dam construction. After comparing the quality control methods of common compaction tests, it is practical to take the compaction degree of fine material with particle diameter less than 20 mm as quality control standard and the compaction degree of complete material as check standard by using three-point compaction test. By the rolling tests of impervious core earth material, the control standard of compaction degree is proposed for Miaowei Hydropower Station project.

关 键 词:碾压试验 三点击实法 防渗土料 苗尾水电站 

分 类 号:TV641.1[水利工程—水利水电工程] TU41[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象