检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]清华大学水沙科学与水利水电工程国家重点实验室,北京100084
出 处:《水力发电学报》2011年第5期157-162,169,共7页Journal of Hydroelectric Engineering
摘 要:说明了利用钢筋混凝土曲梁理论判别混凝土衬砌是否发生第二次开裂的原理和方法,讨论了基本参数如围岩切向抗力τ、法向抗力σr(ra)+pa、钢筋应力不均匀系数ψ的估值范围。通过算例分析了衬砌外缘渗压pa,围岩切向抗力τ,钢筋最大应力σ's,钢筋应力不均匀系数ψ,衬砌围岩的接触状态等重要因素对再裂的影响。分析表明,对于透水衬砌在衬砌脱开围岩独立工作的一般情况下,不易发生第二次开裂。After the first series of cracks of tunnel reinforced concrete linings has formed,to calculate the crack width we must know whether or not an increasing internal water pressure can cause a second series of cracks of these linings.This paper discusses the principle and method for assessment of the second cracking and the possible range of basic parameters,such as average shear-friction stress τ,sum σr(ra)+pa of the normal contact stress(between lining and surrounding rock mass) and pore pressure paon the outer side of the concrete linings,and ratio ψ=s σ′ s of average stress s over the maximum stress σ′ s of reinforcement.An example is used to analyze the effects of these parameters and the contact state between lining and rock mass on the second cracking.The conclusion is that the second series of cracks does not occur when crack reinforced concrete linings work independently.
分 类 号:TV31[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.95