检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟建平[1] 王志硕[1] 候智斌[1] 胡向阳[1]
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2011年第5期10-13,共4页Northwest Hydropower
摘 要:气垫式调压室对降低施工难度,最大限度地保护生态环境有着无可比拟的优势。但调压室对洞室的埋藏条件、岩体的地应力及渗透性要求较高。岗曲河二级水电站气垫式调压室拟选部位出露白云质灰岩及火山碎屑岩,因岩性差异导致围岩的工程地质条件差异较大,文章结合该工程对不同岩性条件气垫式调压室的工程地质条件进行了探讨。Air cushion surge chamber has an unrivaled advantage in decreasing the construction difficulty and protecting the ecological environment to the utmost.However,it puts high requirements on tunnel buried conditions,rockmass geostress and permeability.For Ganquhe II hydropower project,there are exposed dolomitic limestones and volcanoclastic rocks in the proposed location of air cushion surge chamber,and the engineering geological conditions of surrounding rocks are very different due to lithological differences.Based on this project,the paper discusses the engineering geological conditions of air cushion surge chambers under different lithologic conditions.
分 类 号:TV223.1[水利工程—水工结构工程] TV732.5
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28