检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆水利水电勘察设计研究院,新疆乌鲁木齐830000 [2]新疆农业大学水利与土木工程学院,新疆乌鲁木齐830052
出 处:《水利与建筑工程学报》2011年第5期15-17,35,共4页Journal of Water Resources and Architectural Engineering
基 金:新疆水利水电工程重点科学基金项目(20081387970)
摘 要:以新疆小石峡水电站为例,采用FLUENT软件、RNGk-ε紊流模型及VOF方法相结合处理了自由水面,并对溢洪道的流场进行了三维数值模拟,得到了优化溢洪道在设计流量1 856.2 m3/s时的泄流流态,并将消力池段自由水面线、底板压强、断面流速与模型试验结果进行了比较,结果表明数值模拟结果与模型试验结果吻合较好。Combined with the FLUENT software,RNG k-ε turbulent model and VOF method,the free water surface is handled,and 3D numerical simulation is implemented for the flow model on the spillway of Xiaoshixia Hydropower Station.Then the discharge flow patter in the design flow 1 856.2 m3/s of the optimized spillway is gotten,and the free water surface,pressure distribution and velocity are obtained.It is showed through comparison that the numerical simulation results are basically consistent with the test data of physical model.
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43