机构地区:[1]广东电网公司电力科学研究院,广东广州510080
出 处:《广东电力》2011年第9期58-62,共5页Guangdong Electric Power
摘 要:云南至广东±800kV直流输电工程是世界上首个特高压直流输电工程,对该工程调试过程中的交直流侧滤波器、交流侧换流变压器过电压测试技术和调试经验进行总结,从调试项目的设置、调试方法和验收标准等方面,对该工程与±500kV直流输电工程在站调试和系统调试中的过电压测试技术进行分析比较,指出调试中应注意的问题,提出进一步优化和细化调试安全管理模式、大幅缩短试运行时间等建议。± 800 kV DC transmission project from Yunan to Guangdong is the first UHV DC transmission project in the world, in the commissioning process of which, over-voltage test technology and commissioning experience of filters at both AC and DC sides and converter transformer at AC side are summarized. Over-voltage test technologies between station commissioning and system commissioning of the project and ± 500 kV DC transmission project are comparatively analyzed in re- spect of setting of commissioning project, commissioning method and acceptance standards. Attentions in commissioning are indicated and suggestions such as further optimization and division of commissioning safety management mode and drastic shortening of time of test run are made.
分 类 号:TM721.1[电气工程—电力系统及自动化] TM866
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229