检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东电网公司东莞供电局,广东东莞523008 [2]湖南省电力公司调度通信局,湖南长沙410007
出 处:《广东电力》2011年第9期107-110,共4页Guangdong Electric Power
摘 要:针对现有配电网环网接线方式选取的现状,提出了环网接线方式综合优选方法。通过环网接线方式和综合评价指标建模,结合广东某地区配电网规划进行算例分析,对2-1、3-1主备接线方式和3供1备方式3种环网接线方式在相同负荷量下的线路成本、运行损耗、故障停电损失3个评价指标进行考察并折合为费用作综合比较,给出了不同负荷密度下配电网环网接线方式优选的建议。In accordance with current status of selection of loop connection mode for distribution networks, the paper proposes a comprehensive optimal selection method. By loop connection mode and modeling of comprehensive assessment index, the paper makes calculation analysis of distribution networks planning in some place in Guangdong. Line cost, operating loss and loss of accidental blackout of 2-1, 3-1 main and auxiliary connection modes and three-supply plus one auxiliary mode in the same load capacity are reviewed and comprehensively compared in terms of cost. Selections of loop connection of loop connection mode for distribution networks in different load densities are given.
分 类 号:TM645[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33