作 者:卜虎正[1] 刘志斌 汪觉恒 肖和卫[3] 张珑玲[3] 姚建刚[1]
机构地区:[1]湖南大学电气与信息工程学院,长沙410082 [2]湖南省电力勘测设计院,长沙410007 [3]湖南省湘西电业局,吉首416000
出 处:《电力系统及其自动化学报》2011年第5期94-98,共5页Proceedings of the CSU-EPSA
摘 要:针对变电项目现行造价管理的不足,结合全寿命理论和方法,研发了变电站项目全寿命设计决策系统,提出了适合我国国情的变电项目工程分解结构和费用分解结构,阐述了数据库设计、费用单元估算、全寿命费用评价实现的理论和方法。该系统可以合理确定和有效控制工程造价。The decision support system for substation project design based on theory of life cycle cost has been developed in connection with the inadequacy of existing substation project cost management. It puts forward a substation project breakdown structure and cost breakdown structure which satisfies China's national conditions, and expounds the theory and methods for achieving database design, unit cost estimates and life cycle cost evaluation. The system can be used to reasonably identify and effectively control the project cost, besides, the system designed should make life-cycle cost technology applicable to a wide range of substation projects.
关 键 词:寿命周期成本 变电工程 决策系统 费用估算 费用评价
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112