检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南大学三峡库区生态环境教育部重点实验室,西南大学资源环境学院,重庆400715
出 处:《地理研究》2011年第11期2099-2108,共10页Geographical Research
基 金:国家科技支撑计划项目(2006BAD05801)
摘 要:以三峡库区优质柑橘产业带建设土地整理模式研究为目标,以重庆市万州区甘宁镇永胜等两个村土地整理项目(标准化柑橘园)为例,从工程、生物技术方面探讨了改土和配套农业产业化基础设施建设。研究表明:以三峡库区优质柑橘产业带建设目标的土地整理模式必须立足库区复杂多样的立地条件和生态-经济功能差异,配套服务早、中、晚熟不同柑橘品种产业化的改土、田间道路、排灌体系工程,重视改土过程耕作层保护、土壤改良与培肥,以及路、水、林的可持续生态化建设。Taking a land consolidation project for construction of citrus industrial belt in Wanzhou, Chongqing as an example, this paper discussed how land consolidation project could advance agricultural industry (construction of citrus industrial belt), by soil improvement and agricultural infrastructure construction from engineering technology and biological technology. The results suggest that pit planting method is suitable for dry land with deeper soil horizon, while trench planting method is suitable for dry land with thinner soil layer, and ditching-ridge planting method for paddy field. It is essential to dug trenches, back groove, and box groove at a distance of more than 1 m from citrus tree to get rid of the stagnant water in the soil. And, the main ditches among fields are supposed to construct according to landforms, so that surface water, soil water, and groundwater can discharge successfully. The pipelines as PVC and turnover pools are the crucial construction of irrigation systems. First of all, turnover pools connected to PVC pipes should be arranged at the location with high-pressure and large irrigation area. Secondly, the high-level pipes (Ф110mmPVC) and watershed area such as ponds, water reservoirs, natural ditches and irrigation canals are hooked up. Finally, portable water pumps and secondary pipes (Ф50mmPVC) should be matched. Aiming at constructing rural road network, the main field roads are supposed to arrange at a distance of no more than 200 m from the citrus trees, while the production roads with a width of 0.8- 1.5 m should also be built at a distance of less than 75 m. In conclusion, both proper soil improvement measures and supporting agricultural infrastructure to fit in with the needs of different species of citrus are applied simultaneity for land consolidation model with the goal of construction of citrus industrial belt, depending on the complex and diverse conditions and different support services of ecological-economic functions in the Three Gorges Reservoir Ar
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28