检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:代洪波[1]
机构地区:[1]中铁十四局集团有限公司,山东济南252014
出 处:《探矿工程(岩土钻掘工程)》2011年第10期77-79,共3页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:南京长江过江隧道梅子洲明挖段基坑主要包括引道段和盾构到达井,基坑规模大,地下水丰富,地质条件复杂,使得该基坑降水成为整个过江隧道众多关键技术之一。本次在抽水试验基础上设计了基坑降水方案,考虑到周边环境简单,采取了"坑外降水为主,坑内降水为辅"的降水方式,实际结果表明:降水方案合理可行,未对周边环境造成过大的影响。The foundation of Meizizhou open excavation section mainly consisted of approach channel and shield excavation well.Due to the large-scale excavation,abundant groundwater and complex geological conditions,dewatering in foundation pit became one of many key technologies.Because of the simple circumjacent environment,the scheme of dewatering in foundation pit was designed based on the pumping test.It was proved that the scheme was rational and feasible without unfavorable influence to the environment.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.148.76