检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]成都理工大学工程技术学院土木系,四川乐山614000
出 处:《科技信息》2011年第27期I0145-I0146,共2页Science & Technology Information
摘 要:在隧道工程施工中,实时监控量测与回归预测紧密配合工程进展,实时、动态地探明隧道围岩与结构的力学转换机制,攻克设计与施工中各阶段技术难点,并在实际中不断总结和完善理论方法,全面指导全线隧道工程的各项工作,真正实现信息化施工,不仅可以保证工程的顺利进行与圆满完成,而且确保科技成果的转化,达到技术与经济的最优化。In tunnel construction, real-time monitoring and measuring progress in regression work closely with engineering, real-time, dynamic rock tunnel proven mechanical and structural conversion mechanism, to capture the various stages of design and construction of technical difficulties, and in practice continue to sum up and improvement of theoretical methods, the overall guidance of the tunnel project across the board work, construction of information technology truly can not only ensure the smooth and successful project completion and ensure the transformation of scientific and technological achievements, to technical and economic optimization.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31