检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋祺鹏[1] 盛万兴[1] 王金宇[1] 王金丽[1] 杨红磊[1]
出 处:《电力建设》2011年第11期45-47,共3页Electric Power Construction
基 金:中国电力科学研究院青年科研基金项目
摘 要:35kV变电站作为智能电网变电的最后1个环节,其建设量大、分布广泛,故不但要考虑其智能、可靠、安全、高效地运行,还要考虑其经济性;目前该电压等级的智能变电站建设仍然没有可依照的设计规范和建设模式。提出了一种35kV智能变电站的集成化建设模式,从各个方面对智能变电站不同类型的建设模式进行了对比分析。The 35 kV smart substation,the last link of smart substation,is widely distributed with large number of construction projects,of which the economic operation is very important except for smart,reliable,safe and high efficient operation.However,there is still no design specifications and construction modes for the construction of the smart substation with this voltage level at present.Therefore,a integrated construction mode is presented for 35 kV smart substation,and different construction modes of the smart substation are compared from all aspects.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145