检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡伟华[1] 冷元宝[2] 赵志华[1] 杨红云[1]
机构地区:[1]黄河勘测规划设计有限公司工程物探研究院,河南郑州450003 [2]黄河水利科学研究院,河南郑州450003
出 处:《水利水电科技进展》2011年第5期79-81,共3页Advances in Science and Technology of Water Resources
摘 要:通过对紫坪铺2号泄洪排沙洞震损修复工程固结灌浆过程中的抬动监测,介绍抬动观测点的布置、抬动监测装置的安装以及抬动监测过程控制,分析影响抬动变形的因素及灌浆抬动影响范围随距离增大而减小的特点,指出本次抬动监测存在的问题。Based on the lifting monitoring of consolidation grouting process of the rehabilitation project of No.2 flood discharge and sediment diversion hole of Zipingpu Hydropower Station due to earthquake damage,the layout of lifting observation points,installation of lifting monitoring devices and process control of lifting monitoring were introduced.The factors for the lifting deformation and the characteristics of the affected area of lifting caused by consolidation grouting,which decreased with the increase of the distance,were analyzed.The existing problems in the lifting monitoring devices were put forward.
分 类 号:TV543.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7