检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东北电力科学研究院有限公司,辽宁沈阳110006 [2]东北电网有限公司,辽宁沈阳110180
出 处:《水电能源科学》2011年第11期55-59,共5页Water Resources and Power
摘 要:为提高梯级水电站整体效益,以松江河梯级水电站为例,建立了耗水量最小和耗水能量最小梯级水电站短期优化调度数学模型,应用变基增量动态规划法,以总耗水量最小和总耗水能量最小为最优化准则计算分析了两个计划日的梯级水电站短期优化调度。结果表明,耗水能量最小数学模型作为梯级水电站短期优化调度的最优化准则更为准确;变基增量动态规划法求解时间短、精度高。In order to improve the overall benefit gramming is applied to solve short-term optimal sched of cascade hydropower stations, mutative increment dynamic prouling of cascade hydropower stations by taking Songjianghe cascade hydropower stations for an example. Two mathematical models are established by taking minimum water consumption and minimum water energy consumption as optimal goals. And then mutative increment dynamic programming is adopted to solve the problem of two-days scheduling of cascade hydropower stations. The results show that minimum water energy consumption model is more exact and the mutative increment dynamic programming has a satisfactory effect both in reducing solution time and increasing solution accuracy.
关 键 词:变基增量动态规划 短期优化调度 耗水能量最小 耗水量最小 松江河梯级水电站
分 类 号:TV697.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38