作 者:田庆
机构地区:[1]南方电网超高压输电公司检修试验中心,广州510663
出 处:《高压电器》2011年第11期66-71,共6页High Voltage Apparatus
摘 要:简述了天生桥至广州直流输电工程的系统调试过程,分析了广州站选相合闸装置的可靠性、换流变阀侧零序电压保护动作情况、非故障站50Hz保护动作情况、直流落点增多引发连续换相失败的现象及潜在风险、金属回线运行方式下接地极线路开路保护动作情况,并相应提出了改进措施并付诸实施。以上几个技术问题的解决,完善了该工程的控制保护功能,保证了该工程的顺利投运。The commissioning procedure of the Tian-Guang HVDC Power Transmission Project(from Tianshenqiao Hydropower Station to Guangzhou) was described.Some protection and control functions were analyzed,including the reliability of the phase selection switch-on device,the zero sequence voltage protection of the converter transformer,the 50 Hz detection in non-fault substation,the continuous commutation failure due to the multi-infeed HVDC systems,and the earthing electrode open-circuit protection in metallic return mode.Some suggestions about the improvement of the above protection and control functions were offered,and the control and protection functions of the Tian-Guang HVDC project had hence been enhanced.
关 键 词:天广直流输电工程 选相合闸装置 零序电压保护 50Hz保护 连续换相失败 接地极线路开路保护
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249