检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘建强[1]
出 处:《电站辅机》2011年第3期25-27,47,共3页Power Station Auxiliary Equipment
摘 要:介绍了对印度瓦罗拉电厂2×300MW机组部分辅机设备进行选型的情况,并分析了该工程的技术要求和特点,在设备选型的计算过程中,既需按合同中的技术要求;也要针对导致设备造价上升或者不合理的要求,积极准备应对方案与外方及时沟通。该工程设备的选型情况,可为涉外工程提供有益的参考。The type selection of some auxiliary equipment has been introduced in the paper for 2×300MW unit in Warora Power Plant,India.The specifications and the features of the project have been analyzed.During the calculation of type selection,not only the specifications in the contract shall be considered,but also a corresponding scheme shall actively be prepared and Indian side shall timely be communicated against unreasonable requirement or the requirement which would make fabricating cost of the equipment rise.The type selection of the equipment for this project may be of benefit to other foreign projects as the reference.
关 键 词:亚临界 机组 辅机 选型 设备 特点 印度 工程
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117