检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:方明[1]
机构地区:[1]大庆油田有限责任公司试油试采分公司,黑龙江大庆163412
出 处:《油气井测试》2011年第5期62-64,78,共3页Well Testing
摘 要:在射孔测试联作施工中,点火时环空加压超过某一压力值将发生管柱上窜,泄压后测试管柱下行,测试阀关闭的现象,影响负压射孔效果和地质资料的录取。通过对测试管柱井下受力分析,推导给出环空加压点火时,多流测试阀关闭最高井口加压压力上限值计算公式,并验证了其正确性。应用该公式在射孔测试联作工程设计中,可以有效防止在测试过程中因环空加压值过大造成异常关井现象。When the pressure surpassed a certain value,the string goes upward,on the contrary it goes down with perforating test combination process when it is pressure fired in annulus.Shutting in test valve affects the negative pressure perforating effect and recording the geological data.We find the reason that the test valve shut in when the multi-flow evaluator is not lifted up and down through stress analysis of the down hole test string.The calculating formula of the highest well head pressure caused by multi-flow evaluator shutting in is deduced,and the validity is verified.The formula could apply in the well test plan of perforating test combination.The problem of multi-flow evaluator test valve shutting in is solved through applying annulus pressure in the perforating test combination process.
分 类 号:TE353[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222