检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦华中[1]
机构地区:[1]四川省地质矿产勘查开发局区域地质调查队,四川双流610213
出 处:《山东国土资源》2011年第10期35-38,42,共5页Shandong Land and Resources
摘 要:为减少公路工程建设项目和地质灾害之间的相互影响,工程建设之前必须对工程建设用地存在的地质灾害进行评估。结合国道317线汶川至马尔康段公路改建工程的特点,对工程遭受或工程建设可能诱发加剧的滑坡和崩塌灾害发生的可能性作了分析,并提出相应的防治对策,为拟改建的公路建设提供指导性建议。In order to reduce interaction between highway construction projects and geological disasters, risk assessment of geological hazards of construction using land should be carried out before carring out the projects. Combining with characteristics of reconstruction projects from Wenchuan to Maerkang of G317 Highway , possibility of landslides and avalanches caused by engineering construction has been analyzed, and relative protection countermeasures are put forward as well. It will provide suitable suggestions for planned highway construction.
关 键 词:公路建设用地 滑坡 崩塌 危险性评估 汶川马尔康
分 类 号:P642.22[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188