检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南京工业大学岩土工程研究所,江苏南京210009 [2]中国地震局工程力学研究所,黑龙江哈尔滨150080
出 处:《铁道学报》2011年第11期111-117,共7页Journal of the China Railway Society
基 金:国家自然科学基金(90715018);国家公益性行业(地震)科研专项(200808022);江苏省高校自然科学重大基础研究项目(08KJA560001)
摘 要:基于EM64T硬件构架、双路Intel Xeon处理器、Linux操作系统、64位ABAQUS软件、千兆以太网络为集群子网络构建的32CPU并行计算集群平台,对有限元并行计算中心差分显式算法与Hilber-Hughes-Taylor隐式算法的计算精度和效率以及ABAQUS软件中设置黏弹性人工边界计算精度进行比较验证。结果表明:显式与隐式算法计算精度基本相当,但显式算法计算效率远高于隐式算法。对地铁地下结构三维和二维非线性地震反应分析有限元并行计算显式和隐式算法进行对比研究,结果表明:对于自由度数为387 426的地铁车站结构三维非线性地震反应分析,8、16、32CPU并行计算显式和隐式算法耗时比依次为21.89%、23.10%、4.32%;对于自由度数为10 516的地铁车站结构二维非线性地震反应分析,1、2、4CPU并行计算隐式和显式算法计算耗时比依次为41.4%、45.3%、51.8%;多CPU并行计算显式算法适合求解大规模数值计算问题,多CPU并行计算隐式算法适合求解小规模数值计算问题。The computing platform is based on the EM64T hardware framework,dual-path Intel Xeon processor,and Gigabit Ethernet subsystem which contains 32 CPUs and configures 64-bit ABAQUS applications and Linux operating system.The calculation precisions and efficiency of the explicit finite element method which uses the central difference method and the implicit finite element method which uses the Hilber-Hughes-Taylor method are verified,the precisions with the viscous-spring artificial boundaries are verified simultaneously.The results show that the calculation precisions of the explicit finite element method and the implicit finite element method are basically the same,but the efficiency of the explicit finite element method is much higher than that of the implicit finite element method.In the research,the comparisons between the explicit and implicit finite element methods using multiple processors in the 2D and 3D nonlinear seismic responses of metro station structures were achieved.The results show as follows: For the case of the 3D large-scale model with DOF being 387 426,the solution time of the explicit finite element method using 8 CPU,16 CPU and 32 CPU are respectively 21.89%,23.10% and 4.32% of that of the implicit finite element method;for the case of the 2D small-scale model with DOF being 10 516,the solution time of the implicit finite element method using 1 CPU,2 CPU and 4 CPU are respectively 41.4%,45.3% and 51.8% of that of the explicit finite element method;so the explicit finite element method with multiple processors parallelization is fit for large-scale numerical computing problems while the implicit finite element method with multiple processors parallelization is fit for small-scale numerical computing problems.
关 键 词:地铁地下结构 动力非线性 并行计算 显式算法 隐式算法
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249