东北地区水利水电工程施工期冰情预报及度凌措施  

Ice regime forecast and controlling measures in construction phase of hydropower project in northeast China

在线阅读下载全文

作  者:白花琴[1] 刘书宝 

机构地区:[1]水利部松辽水利委员会,吉林长春130021 [2]中国水电顾问集团公司北京勘测设计研究院,北京100024

出  处:《东北水利水电》2011年第11期28-29,71,共2页Water Resources & Hydropower of Northeast China

摘  要:东北地区河流均存在不同程度冰情,河流封江期和开江期冰情对工程安全施工存在一定风险。文章根据东北地区莲花水电站、尼尔基水利枢纽工程施工期渡凌实践,通过冰情预报方案编制、工程渡凌措施和非工程渡凌措施等方面的论述,对施工期冰情预报方案编制和渡凌措施的技术问题进行了总结,提出了比较合理的建议。The rivers have the ice regimes with different degree in northeast China,the ice regimes in freezing or thawing period have some risks for the project safety.Based on the ice controlling practices during the construction period of Lianhua hydropower station and Nierji hydro-junction,the paper discusses the forecast scheme compilation and the engineering and non-engineering controlling measures,summarizes the technology questions for the above-mentioned things and puts forward some reasonable suggestions.

关 键 词:水利水电工程 施工期 冰情预报 渡凌措施 东北地区 

分 类 号:P338.4[天文地球—水文科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象