检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2011年第11期51-52,63,共3页Water Resources & Hydropower of Northeast China
摘 要:文章以建在强震区深厚覆盖层上的土石坝为研究背景,采用等效粘弹性模型,研究不同覆盖层厚度、不同坝高等工况下,地震对坝顶加速度和坝体位移的影响。研究表明随着覆盖层厚度的增加,加速度反应整体有减小的趋势,但是由于模型基频特性的影响,可能出现时大时小的状况;随着输入值的增大,大坝水平动位移逐渐增大。随着覆盖层厚度的增加,大坝水平动位移也逐渐增加。Based on the built earth-rock dam on deep overburden and meizoseismal area,the paper analyzes the influence of earthquake on the dam crest acceleration and the dam body displacement under the different thickness of overburden and the different dam height by using the equivalent viscoelastic model.The results show that the acceleration has the decrease trend,but the changing circumstances may exist because of the influence of the model fundamental frequency characteristics.The horizontal dynamic displacement of dam will gradually increase with the input value increases.With the increase of overburden thickness is the same situation.
分 类 号:TV221[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117