积石峡水电站导流洞交叉段平顶扭面拱衬砌模板及支撑设计  

Concrete Lining Formwork and Support Design for the Flat-twisted Crown of Crossing Section in the Diversion Tunnel of Jishixia Hydropower Station

在线阅读下载全文

作  者:吴晓斌 柳晓龙 巨金星 

机构地区:[1]中国水利水电第四工程局有限公司第一分局,青海西宁810006

出  处:《水力发电》2011年第11期67-69,共3页Water Power

摘  要:积石峡水电站导流洞与中孔泄洪洞交叉段体形复杂、施工场地狭窄、施工质量要求高,其顶拱形式为两个城门形顶拱相切形成的平顶扭面拱。根据这些特点和施工特殊性,对交叉段模板及支撑系统进行了设计,并采用底部钢管支柱支撑桁架梁平台,平台上搭设碗扣式脚手架支撑顶部模板的施工方案,成功克服了施工中的各种问题,及时有效地完成了衬砌施工。The cross section of diversion and middle spillway tunnels in Jishixia Hydropower Station has a complex shape and the crown is a flat-twisted arch as the tangeney of two gate-shaped crowns. Because of the narrow construction site and high construction quality requirements, the formwork and support system for the concrete lining of cross section are specially designed as using steel pillars in bottom to support truss beam platform and setting cuploek scaffold on the platform to support crown formwork. The problems in construction are successfully solved and the lining construction is timely completed.

关 键 词:导流洞 中孔泄洪洞 平顶扭面拱 混凝土衬砌 模板设计 支撑结构 积石峡水电站 

分 类 号:TV554.14[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象