检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河上游水电开发有限责任公司工程建设分公司,青海西宁810000
出 处:《水力发电》2011年第11期76-77,共2页Water Power
摘 要:积石峡水电站压力钢管整体卷制是大直径钢管制作的一种新工艺,已获得国家专利。整体卷制技术改变了压力钢管制作的传统工艺,全过程无需起吊设备实现流水线作业。但在整体卷制过程中会产生程度不同的螺旋线性变形,如其变形不能有效控制就会影响管节制造质量。积石峡水电站采取了相应的预防措施,有效控制了螺旋变形。The integral rolling of penstocks for Jishixia Hydropower Station Penstock is a new technology of large-diameter steel pipe fabrication and has been approved as a Chinese patent. This new technology can fabricate penstocks without lifting and achieve pipelining process, but it will produce spiral deformation of penstock in different degrees which will lead to poor quality of penstock if can not be controlled. The preventive measures are taken in the integral rolling of penstocks for Jishixia Hydropower Station to effectively control the spiral deformation.
分 类 号:TV732.41[水利工程—水利水电工程] TK730.6[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145