地铁区间临时用电施工组织设计  被引量:2

The Design of Temporary Power of Part of the Subway Construction

在线阅读下载全文

作  者:王希亮 

机构地区:[1]中铁十七局集团建筑工程有限公司,山西太原030006

出  处:《机械管理开发》2011年第6期61-64,66,共5页Mechanical Management and Development

摘  要:西安市地铁二号线一期工程会展中心至韦曲南段D2TJSG-23标段,主要工作为三爻站—凤栖原站区间隧道,隧道采用浅埋暗挖法施工。文章针对施工用电方案、施工机械设备、配电系统布置、电力负荷计算、防雷装置、外电线路及电气设备防护、安全用电责任制和组织措施、电气防火措施及临电检查等进行论述。The No 2 Subway Line in Xi'an of the southern of Convention and Exhibition Center to Wei Qu D2TJSG-23 sections, mainly the work of three of the original Yao Station to Station Fengqi tunnel, the tunnel excavation method use shallow. The article is about the eonstruction of electricity scheme, construction machinery and equipment, power distribution system layout, load calculation, lightning protection devices, wiring and electrical equipment protection foreign, security, accountability and organizational measures electricity, eleetrical fire prevention measures, and temporary electrical inspection, etc.

关 键 词:施工用电 电气设备防护 用电组织措施 临电检查 

分 类 号:U231[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象