检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱国涛[1]
机构地区:[1]五矿邯邢矿业安徽开发矿业有限公司,安徽霍邱237464
出 处:《矿业工程》2011年第6期20-22,共3页Mining Engineering
摘 要:针对吴集铁矿矿床被约140m厚第四系岩石覆盖,采矿过程中地表不允许塌落,合理选择了阶段空场嗣后充填法采矿,开展了低品位铁矿高浓度全尾砂结构流胶结充填实验研究并成功应用,取得良好的经济和社会效益。Wuji Iron Ore mine is covered fully by rocks of quaternary system, and the subsidence of earth surface during mining operation is not permitted. Therefore, the technology of stowing (filling) after open stope mining is selected. As consolidated fill material, the high-density tailings from beneficiation process of low- grade iron ore are tested with satisfactory result. The successful application of such tailings has achieved good economic and social benefits.
关 键 词:结构流全尾砂胶结充填 充填体 强度 效益
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.94.214