检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《施工技术》2008年第S1期150-153,共4页Construction Technology
摘 要:结合上海人民广场换乘大厅基坑工程监测数据,对基坑开挖引起的围护结构水平位移、坑底隆起的规律进行了分析。监测结果表明:开挖卸载引起围护结构向坑内位移,位移量随开挖深度的增加而增大,最大水平位移以及最大变形速率发生的位置相应逐渐下移,该位置一般在开挖面以下2m左右;一个月左右的停工足以引起围护结构水平位移出现大幅度增加;坑底隆起量随开挖深度的增加而增大,开挖停止后隆起速率很快减小,隆起量趋于稳定。Retaining structure horizontal displacement and uplift law of foundation bottom are analyzed according to monitored data of foundation pit engineering in Shanghai People Square.It shows that displacement caused by excavation increases with excavation depth,and the maximum displacement and deformation rate turn downward accordingly,which keep at 2m down to excavation surface.Displacement increaseds remarkably when construction stops for about one month.The uplift increases with exaction depth,and the uplift speed reduced quickly when excavation stops,then,it turns stable.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28