检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国原子能科学研究院反应堆工程研究设计所,北京102413
出 处:《核动力工程》2006年第S2期45-49,共5页Nuclear Power Engineering
摘 要:中国先进研究堆(CARR)热水层(HWL)是反应堆水池上部形成的一层温度稍高的热水,它可以阻止水池下部含有较高放射性物质的水通过对流到达池水表面,从而降低反应堆大厅内的放射性剂量水平。本文采用经验公式计算了建立热水层所需的加热功率,并采用计算流体力学软件CFX分析了堆水池内流场和温度场。结果表明,CARR热水层的加热功率为120kw;在水池表面形成了热水层,但热水层的厚度不均,平均厚度约1.8m,最薄处约0.5m。Hot Water Layer(HWL)of China Advanced Research Reactor(CARR)is a layer of hot water on the top of the reactor pool.It prevents the lower water containing radioactive material reach the surface of the pool through convection,so as to drop down the radiation level of the reactor hall.This paper calculated the heating power required to construct the HWL with experience relations,and analyzed the flow and temperature field of the reactor pool using computational fluid dynamics software CFX.The results imply that the heating power rate of CARR HWL is 120kW,the HWL is formed in the top of the reactor pool,but uneven,and the average thickness of HWL is about 1.8m.
分 类 号:TL411[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28