检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电力科学研究院,北京市海淀区100085
出 处:《电网技术》2006年第S2期524-529,共6页Power System Technology
摘 要:2006年是《十一五规划》开局之年。该文结合我国当前能源供需实际,论述了新时期需方资源开发、调度工作重点,提出了政策法规、组织机构、激励政策及融资建议;结合江苏能效电厂项目规划,提出了实施DSM,开发、调度需方资源的长效机制。The year of 2006 is the beginning of 'the outline of the eleventh five-year plan'. The paper presents key works of the development and dispatch of demand side resource; bring forward rules and policies, organizers and structures, exciting policies and suggestions for financing concerning the current practical needs and supply of energy in our country. Based on the project plan of Jiangsu energy efficiency product , the paper also gives the long-term mechanism of implementing DSM and developing and dispatching demand side resources.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145