检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]马鞍山钢铁股份有限公司
出 处:《安徽冶金》2005年第3期28-30,共3页Anhui Metallurgy
摘 要:马钢第一炼铁总厂"三改二"高炉改造设计中采用了多项新技术、新工艺和新设备,其中,干法煤气净化系统、水冲渣系统、TRT余压发电系统、槽下布袋除尘系统和热风炉拱顶采用悬链线型等在我厂高炉改造中均为首次采用。投产第二个月高炉利用系数已达到3.1t/m3·d以上,入炉焦比440kg/t,创我厂高炉开炉最快达产记录。Various new techniques, processes and equipments have been adopted in the design of the '3 to 2' Blast Furnace Reconstruction Project at the No.1 General Ironmaking Plant of Masteel, among them the dry gas-purification system, the slag water-flushing system, the TRT electricity-generation system using residual pressure, the bag dedusting system and the hot-blast stove with a catenary arch are all used for the very first time at the plant. Only in the second month of production of the new plant, the productivity ratio and charge coke ratio already exceeded 3.1t/m3·d and 440kg/t respectively, marking the fastest BF on-stream of the plant.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28