作 者:陈建[1]
机构地区:[1]铁道部隧道工程局,洛阳471009
出 处:《矿产勘查》2000年第9期32-34,共3页Mineral Exploration
摘 要:邓家湾 1 #隧道为车站 3线大跨隧道 ,跨度大 ,结构扁平 ,地质复杂 ,施工难度大。在该隧道施工中 ,通过变更施工方法 ,以小导坑贯通揭示地质 ,及对监测资料的分析 ,确定了大跨段采用台阶法通过的施工方案 。Dengjiawan tunel No.1 is three-line long-span tunnel in station.It is of long span,flat structure,and complex geological conditions.And thus it is difficult to be constructed.During the construction of this tunnel,through a ltering construction method,revealing geological situations by the penetration of base tunnel,and analyzing the data from monitoring,We determined the data from monitoring,We determined the construction scheme of using bench method to pass through long-span section,which laid the foundation of safe and smooth construction of this tunnel.the successful completion of this tunnel offersuseful reference and guidance for the design and construction of later similar project.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145