册田水库南副坝工程地质问题论证及处理  被引量:1

Analysis and Treatment of Engineering Geologic Problem in South Auxiliary Dam of Cetian Reservoir

在线阅读下载全文

作  者:兰艇雁[1] 任林森[1] 安民[1] 王爱珍[1] 

机构地区:[1]水利部山西水利水电勘测设计研究院,太原030024

出  处:《山西水利科技》1999年第S1期25-28,共4页Shanxi Hydrotechnics

摘  要:册田水库大坝枢纽工程始建于1958 年,南副坝在建库以后曾发生过危险性管涌。1995 年进行了补充地质勘察,查明了南副坝一系列工程地质问题,并有针对性进行了处理。The dangerous piping occurred in south auxiliary dam after Cetian Reservoir was built in 1959. A series of the engineering geological problem in the south auxiliary dam became evident after the supplementary geologic investigation was done in 1985.The treatmemt suggested according to the above investigation was carried out and finished.The better results of the treatment achieved together with the real conditions are introduced in this paper.

关 键 词:潜蚀 管涌 液化 湿陷 古河道 

分 类 号:TV697[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象