检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:兰艇雁[1] 任林森[1] 安民[1] 王爱珍[1]
机构地区:[1]水利部山西水利水电勘测设计研究院,太原030024
出 处:《山西水利科技》1999年第S1期25-28,共4页Shanxi Hydrotechnics
摘 要:册田水库大坝枢纽工程始建于1958 年,南副坝在建库以后曾发生过危险性管涌。1995 年进行了补充地质勘察,查明了南副坝一系列工程地质问题,并有针对性进行了处理。The dangerous piping occurred in south auxiliary dam after Cetian Reservoir was built in 1959. A series of the engineering geological problem in the south auxiliary dam became evident after the supplementary geologic investigation was done in 1985.The treatmemt suggested according to the above investigation was carried out and finished.The better results of the treatment achieved together with the real conditions are introduced in this paper.
分 类 号:TV697[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15