洪家渡水电站混凝土面板堆石坝施工  

Construction of Concrete Face Rockfill Dam of Hongjiadu Hydropower Station

在线阅读下载全文

作  者:段伟[1] 文亚豪[1] 蔡金良[1] 何应强 

机构地区:[1]电力工业部贵阳勘测设计研究院,贵阳550002

出  处:《贵州水力发电》1997年第2期34-39,60,共7页Guizhou Water Power

摘  要:洪家渡大坝为一将建于狭窄河床上的高混凝土面板堆石坝,经过必要性和可行性分析,其施工将采用全年导流方式进行。为了开挖左岸陡峭坝肩170万m3岩石,施工规划中提出了合乎实际的施工工艺。本文对面板堆石坝的施工分期、土石方平衡、料场选择和填筑工艺作了阐述,也对施工进度作了说明。The dam of Hongjiadu Hydropower Station is a concrete face rockfill one built on narrow riverbed. Analyzed necessity and feasibility, the method of diversion around year during construction period is adopted. A reasonable construction process is put forward in construction plan in order to excavate the mass of rock, which volume reaches 1, 700, 000 m3, in the cliff on the left bank. Construction stages and progress, equilibrium of earth-rock, selection of quarries as well as filling process is described in the paper.

关 键 词:洪家渡水电站 混凝土面板堆石坝 施工 规划 

分 类 号:TV64[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象