检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周圣元
机构地区:[1]长沙矿山研究院,湖南410012
出 处:《矿业研究与开发》1996年第S1期62-67,共6页Mining Research and Development
摘 要:铜绿山矿原设计采用点条柱上向水平分层水砂充填法开采,经多年实践表明,该法问题多而不适应矿山生产要求,为解决问题,改用深孔崩矿阶段充填法.本文总结了该法的试验研究成果,推出品字形采场结构、球状和柱状药包在深孔爆破中应用的新材料与新工艺、三合一胶结充填方法和高水固化材料充填接顶工艺等内容.试验研究取得了显著的技术经济效益.The origninal mining design in Tonglushan mine was upward cut-and-fill mining with point and strip pillars and hydraulic stowage. The many-years practice showed that this mining method was not suitable for the requirements of mining produc-tion due to many problems. In order to solve these problems, the longhole caving and level filling method instead of original mining method was used. The author sums up the achievements in the experimental study on the experiment method, and makes an introduc-tion to '品'-shape stope structure, new material and technology of both spherical and col-umn charges used in the longhole blasting, the three-in-one cemented filling method, and roof-contact filling with high-water consolidating materials etc, including the remarked technical and economic results produced from this mining method.
关 键 词:深孔崩矿 球状和柱状药包爆破 胶结充填 高水固化材料 充填接顶
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28