检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡灿舟
机构地区:[1]长沙矿山研究院
出 处:《矿业研究与开发》1995年第S1期17-20,共4页Mining Research and Development
摘 要:建设一千万吨级大型露天矿是我国采矿工业发展的战略需要,而拥有与其相适应的大型成套设备又是此类矿山建设的必备条件。因此,国家批准将“一千万吨级露天矿大型成套设备研制”列为重点攻关项目。经参加攻关单位的共同努力,研制出了多种大型矿用设备。本文着重介绍我院机械研究所与有关单位合作为一千万吨级露天矿建设研制的五大设备的基本特色,并列举了其它单位在这一攻关工作中的设备研制情况。The building of ten million tonnage open pit mines is a strategic need for thedevelopment of China’s mining industry.Meanwhile, providing the large-sized completeequipment adaptable to it is a necessary condition of such mine construction.Therefore,thechinese government lived the development of the large-sized complete equipment for tenmillion tonnage open pit mine as a focal project of key technical problem tackling.Through a joint effort made by the units taking part in this project,different kinds oflarge-sized mine equipments were developed.This paper describes emphatically the basicfeatures df five large equipments developed for the building of a ten million tonnage openpit mine by CIME Machinery Research Institute together with the units concerned,and theequipments developed by the other units taking part in the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3