检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李丹[1] 贾琳[1] 许晓菲[1] 王蓓[1] 王宁[1] 谢旭[2]
机构地区:[1]华北电网有限公司,北京市100053 [2]张家口供电公司,河北省张家口市075000
出 处:《电力系统自动化》2011年第22期41-44,共4页Automation of Electric Power Systems
基 金:国家高技术研究发展计划(863计划)资助项目(2011AA05A101)~~
摘 要:随着风电机组的大规模并网,机组脱网问题逐渐凸显,对电网的安全稳定运行产生了较大威胁。结合风电机组脱网实例,分析了脱网原因及内在机理,揭示了风电设备在安全性能、技术指标及运行管理等方面存在的若干问题,提出了改善和解决风电机组脱网问题的措施和建议。With the rapid increasing of wind turbines' connection into grid,the trip-off problem becomes more and more prominent.Large scale wind turbines' trip-off seriously threatens the safe and stable operation of the grid.Take a case for example,this paper analyses the causes and inner mechanism of wind turbines' trip-off from grid.Several key deficiencies existing in the safety requirements,technical performances,and operation management of wind power industry are revealed.Improvement methods and solutions are proposed.
关 键 词:风力发电 风电机组 脱网 低电压穿越 安全稳定 无功补偿 电压控制
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30