检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周泉林 李峻[2] 刘海春[1] 陈峰[2] 郑丛杰[2] 佟溥翘[2]
机构地区:[1]唐山不锈钢有限责任公司,河北唐山063000 [2]钢铁研究总院冶金工艺所,北京100081
出 处:《炼钢》2011年第6期5-7,共3页Steelmaking
摘 要:介绍了后搅工艺在100 t复吹转炉中的应用,当一次倒炉钢水w(P)<0.040%时,通过单纯后搅或后搅的同时添加少量矿石,后搅时间120~150 s,钢水w(P)能稳定控制在0.020%以下,平均脱碳质量分数为0.01%,LP提高46.8。单纯后搅和后搅同时添加矿石,钢水温降分别为10.2和31.4℃。试验表明,后搅时间达到120 s后,脱磷速度、温降趋于定值,合理的后搅时间是120~150 s。The present paper introduces the post-stirring process in 100 t converter. Practice shows that when w(P) in the hot metal is less than 0. 040 % in a single tapping the w(P) in the hot metal can be constantly controlled in the limit of less than 0. 020 %, the quality fraction of average decarburization maintains at 0. 01% and Lp improved by 46. 8 by adoption of post-stirring exclusively or post-stirring plus addition of small a- mount of ore for 120 to 150 s. Temperature drop of the hot metal is 10. 2 and 31.4℃ by post-stirring exclusively and post-stirring plus addition of ore. Tests show that the de- phosporization speed and temperature drop tend to maintain at a fixed value as soon as the post-stirring time reaches 120 s and therefore the appropriate post-stirring time shall be 120 to 150 s.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15