机构地区:[1]山东电力工程咨询院有限公司,山东济南250013
出 处:《山东电力技术》2011年第5期6-8,共3页Shandong Electric Power
摘 要:近年来,220 kV变电站中高压配电装置采用GIS设备越来越普遍,根据变电站的规模,220 kV、110 kV GIS接线型式为双母线时,扩建时变电站全部停电的缺点逐渐暴露。通过实例技术经济比较,提出220 kV变电站GIS双母线接线优化为双母线刀闸分段接线的优化方案。该方案的提出,有效地避免了目前变电站扩建时需全站停电的问题。In recent years, Gas Insulated Metal-enclosed Switchgear are applied more popularly at the 220 kV substation. However, the 220 kV substation site-wide blackout will happen during the period of the substation extension and reconstruction, with the double-bus electrical connection applied. Depending on the practical project and based on the technical-economical comparison, the optimized design scheme with the double-bus and Subsection breaker electrical connection applied, is proposed. With this scheme, the substation site-wide blackout can be avoided.
分 类 号:TM633[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222