机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]中国水电顾问集团成都勘测设计研究院,四川成都610072
出 处:《东北水利水电》2011年第12期3-3,42,共2页Water Resources & Hydropower of Northeast China
摘 要:龙江水电站枢纽工程大坝为椭圆混凝土双曲拱坝,坝基地质条件较复杂,坝址区地震基本烈度为Ⅷ度。设计进行了大量的分析、研究工作,通过拱坝体形优化、坝体应力分析、坝肩抗滑稳定分析,选用椭圆混凝土双曲拱坝,既保证了工程安全,又减少了大坝混凝土方量,节省了投资,为工程的开工建设奠定了基础。The dam of Longjiang hydropower station is concrete elliptic double-curvature arch dam.The geological condition of dam foundation is complex.Seismic basic intensity of dam-site is eight degree.Based on a lot of analysis and study work,the concrete elliptic double-curvature arch dam is selected by arch dam shape optimization,dam stress analysis and the stability analysis against sliding of dam abutment,which could ensure project safety,decrease volume of dam's concrete,save investment and lay foundation of project construction.
分 类 号:TV642.42[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40