胶新铁路路桥过渡段路基沉降规律研究  被引量:5

Analysis on Subgrade Settlement Law in Road-Bridge Transition Section of Jiaozhou-Xinyi Railway

在线阅读下载全文

作  者:乔东华[1] 刘升传[2] 

机构地区:[1]贵州省交通规划勘察设计研究院,贵阳550001 [2]交通运输部公路科学研究所,北京100088

出  处:《路基工程》2011年第6期45-48,共4页Subgrade Engineering

摘  要:桥头跳车问题影响着铁路建设和运营,迫切需要解决。结合胶新铁路当地实际情况,开展相关研究,有效减轻差异沉降和桥头跳车的影响,具有重要的现实意义。首先介绍了胶新铁路试验段的基本情况以及试验采用的仪器和测试原理,然后详细分析了不同地段通车前和通车后路桥过渡段的沉降变形特征。The problem of bumping at bridge head affects railway constriction and operation, which need to be solved urgently. Combined with the local practice of Jiaozhou-Xinyi Railway, related research is conducted to effectively reduce the influence of differential settlement and bumping, which has important practical significance. This paper first introduced the basic situation of Jiaozhou-Xinyi Railway test section and the instrumentation and principle for test; then analyzed the settlement characteristics of road-bridge transition section in different sections before and after opening to traffic.

关 键 词:胶新铁路 路桥过渡段 路基沉降 

分 类 号:U213.157[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象