安康地区水电送出深化研究  被引量:1

Further Studies on Delivery of Hydroelectricity in Ankang Power Grid

在线阅读下载全文

作  者:李复明[1] 赵刚[1] 韦汶妍[1] 王新[1] 王明[1] 

机构地区:[1]陕西电力科学研究院,陕西西安710054

出  处:《陕西电力》2011年第11期39-42,共4页Shanxi Electric Power

摘  要:结合安康电网"十二五"规划,对安康电网水电送出存在的问题进行了分析,对"十二五"期间安康电网电源容量进行了分析统计,确定了"十二五"期间电源逐年规模;对水电送出面临的330 kV网架薄弱、关庙一岚皋110 kV线路送出压力大、平利镇坪2县水电送出受阻共3个突出问题进行了深入的分析研究,并提出了相关解决建议。Based on the twelfth five-year plan of Ankang power grid, the paper discusses the problems existed in the delivery of hydroelectricity in Ankang power grid, statistical analyzes the capacity of power source, determines the scale of power sources yearly during the twelfth five-year, analyzes & studies the three prominent problems in hydroelectricity, which are the weakness of 330 kV network frame, the huge delivery pressure on 110 kV transmission line from Guanmiao to Langao and the unfavorable delivery in Pingli & Zhenping, and proposes some suggestions on how to solve these problems.

关 键 词:安康电网 水电 突出问题“十二五”规划 研究 

分 类 号:TM722[电气工程—电力系统及自动化] F426.61[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象