检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国地质科学院勘探技术研究所,河北廊坊065000 [2]广东省地质建设工程勘察院,广东广州510080 [3]广东省物料实验检测中心,广东广州510080 [4]河北省地矿局国土资源勘查中心,河北石家庄050081
出 处:《探矿工程(岩土钻掘工程)》2011年第11期71-75,共5页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:紧邻地铁基坑支护必须确保地铁运营的安全,具有难度大、支护安全储备高的特点。结合广州市林和村改建项目A地块临近地铁基坑支护工程实例,通过三维数值分析计算,基坑位移、稳定性均可满足设计要求。并对薄弱点进行加强监测。最后通过实测值复核计算值,实测值基本控制在计算值范围内。The safety of subway operation must be ensured in the construction of foundation pit support project close to the subway with great difficulty and high safety margin.This paper describes an engineering practice of foundation pit support close to the subway,by the three-demensional numerical analysis,the displacement and stability of the excavation met the design requirement and the weak points were mainly monitored.According to the check calculation on measured values,the measured values were controlled in the range of calculated values.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28