检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史国宝[1]
出 处:《核动力工程》2011年第6期110-114,共5页Nuclear Power Engineering
摘 要:恰希玛核电厂2号机组在稳压器上增设一个电动节流阀,用于在"充水-排汽"冷却中实施排汽,以及严重事故高压熔堆下快速降压。本文采用SCDAP/RELAP5/MOD3.1程序分析了全厂断电叠加2个系列柴油机辅助给水系统失效事故,结果表明,增设的稳压器电动节流阀能有效地实施严重事故下快速降压,缓解事故后果。A motor operated valve(MOV) is added on the Pressurizer for CHASHMA NPP Unit 2,to implement the bleed function in Feed-Bleed cooling mode,and depressurize rapidly the RCS during high pressure core melt in severe accident.This paper analyzes the accident consequence of Station Blackout co-incident with the loss of Diesel Driven Feedwater Pumps using the computer code of SCDAP/RELAP5/MOD 3.1,and the analysis results justify that the added MOV is able to depressurize the RCS effectively to miti-gate the accident consequence in severe accident.
分 类 号:TL351.6[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62