检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王明[1] 戴曦[1] 邬建辉[1] 张保钢 吴永谦[1] 陈田庄[1]
机构地区:[1]中南大学冶金科学与工程学院,长沙410083 [2]上海派特贵金属有限公司,上海200023
出 处:《贵金属》2011年第4期6-10,15,共6页Precious Metals
摘 要:采用烧结-溶出法溶解废催化剂中氧化铝基体,使铂富集,进而从不溶渣中回收铂。研究结果表明:废催化剂于600℃焙烧1 h,炭残余量为0.54%,脱炭率达到92.66%;烧渣按配料分子比1.2配料,800℃烧结反应2 h,熟料于95℃热水溶出10 min,一次烧结-溶出,渣率为5.04%,氧化铝溶出率为98.10%,氧化钠溶出率为99.25%,铂富集了17.87倍。The sintering- leaching method was used in order to dissolve the alumina in spent catalysts. Platinum was then recovered from the residues after enriching process. The results showed : 1 ) the residual carbon was 0.54% with a high decoking rate of 92.66% , after roasting the spent catalysts at 600℃ for 1 h ; 2) the residue rate was 5.04% , the dissolution rate of alumina and sodium oxide were 98.10% and 99.25%, respectively, and the platinum was enriched 17.87 times with the one -step sintering -leaching process : the cinder was added sodium hydroxide with a molecular proportion of 1.2, then sintered at 800℃ for 2 h, the clinker was leached at 95℃ for 10 min.
分 类 号:TF833[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28