钢筋混凝土双烟囱交叉折叠倒塌爆破数值模拟  被引量:1

Numerical Simulation of Blasting of Two Reinforced Concrete Chimney with Cross Folding Collapse

在线阅读下载全文

作  者:罗德丕 池恩安[2,3] 詹振锵[3] 王丹丹[3] 张修玉[3] 

机构地区:[1]贵州久联民爆器材发展股份有限公司,贵阳55001 [2]贵州新联爆破工程有限公司,贵阳550002 [3]贵州大学矿业学院,贵阳550003

出  处:《爆破》2011年第4期27-30,36,共5页Blasting

摘  要:针对2座钢筋混凝土烟囱爆破拆除倒塌场地长度小于烟囱高度的特殊情况,拟采用双向折叠交叉倒塌的爆破技术方案。为了对所采取方案进行验证,在爆破前首先采用ANSYS建立分离式共节点实体模型,并对有限元网格进行划分,然后在DYNA环境下完成对烟囱倒塌过程的数值模拟计算,模拟结果表明所采取的方案可行、有效。实际烟囱倒塌过程、倒塌长度与数值模拟结果较为吻合,因此可认为拆除爆破前,采用数值模拟方法对爆破方案进行验证,并优化爆破设计方案具有重要意义。Aim at the special situation of the length for collapsing less than the height of chimney, the blasting scheme of cross folding collapse was used to demolish the two reinforce concrete chimney. Before the blasting, for tes- ting and verifying the scheme, the ANSYS was used to establish the separate entity model of nodes and meshing, then simulating the collapse course of the chimney in DYNA. The simulation result shows that this scheme is feasible and valid. After blasting, the collapse course and the collapse length of chimney axe coincide with the simulation result, so using the simulation tests and verifys and optimizes the blasting scheme before blasting is very important.

关 键 词:钢筋混凝土双烟囱 爆破拆除 数值模拟 

分 类 号:TU746.5[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象