检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国长江电力股份有限公司三峡梯级调度通信中心,湖北宜昌443133 [2]中国长江电力股份有限公司三峡梯级调度通信中心成都分中心,四川成都610041
出 处:《水利水电技术》2011年第12期88-92,共5页Water Resources and Hydropower Engineering
基 金:国家科技支撑计划(2009BAC56B03)
摘 要:基于对三峡发电量影响因素的分析,提出了较为符合实际中长期发电计划的计算方法,有助于提高发电计划制作的合理性、科学性、准确性,为正常运行期三峡水库发电的合理优化调度提供参考依据。Based on the analysis made on the influence factors on the energy output of the Three Gorges Hydropower Station, a method for calculating a more feasible and practical mid-long term power generation plan is put forward herein, which is helpful to enhance rationality, science and accuracy for making the power generation plan concerned, and then provides a reference basis for reasonably optimizing the dispatch of the power generation with the Three Gorges Reservoir during the normal operation period as well.
分 类 号:TV737[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229