三峡电站中长期发电计划计算方法研究  被引量:4

Study on the calculating method for mid-long term power generation plan of Three Gorges Hydropower Station

在线阅读下载全文

作  者:鲍正风[1] 张雅琦[1] 刘志武[2] 

机构地区:[1]中国长江电力股份有限公司三峡梯级调度通信中心,湖北宜昌443133 [2]中国长江电力股份有限公司三峡梯级调度通信中心成都分中心,四川成都610041

出  处:《水利水电技术》2011年第12期88-92,共5页Water Resources and Hydropower Engineering

基  金:国家科技支撑计划(2009BAC56B03)

摘  要:基于对三峡发电量影响因素的分析,提出了较为符合实际中长期发电计划的计算方法,有助于提高发电计划制作的合理性、科学性、准确性,为正常运行期三峡水库发电的合理优化调度提供参考依据。Based on the analysis made on the influence factors on the energy output of the Three Gorges Hydropower Station, a method for calculating a more feasible and practical mid-long term power generation plan is put forward herein, which is helpful to enhance rationality, science and accuracy for making the power generation plan concerned, and then provides a reference basis for reasonably optimizing the dispatch of the power generation with the Three Gorges Reservoir during the normal operation period as well.

关 键 词:三峡电站 中长期发电计划 电量排频 发电风险 

分 类 号:TV737[水利工程—水利水电工程]

 