检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于斌[1,2]
机构地区:[1]大同煤矿集团有限责任公司,山西大同037003 [2]中国矿业大学,江苏徐州221008
出 处:《煤炭科学技术》2011年第12期29-32,71,共5页Coal Science and Technology
基 金:"十一五"国家科技支撑计划重点资助项目(2008BAB36B01)
摘 要:为提高塔山矿石炭系特厚煤层顶煤采出率,运用数值分析、相似模拟分析、实测统计分析以及工业性试验等方法,研究了大采高综放开采工艺中最为关键的机采高度及放煤工艺问题。研究及实践结果表明,在塔山矿8105工作面的地质开采条件下,合理机采高度为4.0~4.3 m,合理放煤步距为一刀一放0.8 m,合理放煤方式为多轮间隔顺序多口放煤。In order to improve the top coal recovery rate of the thick seam in Carboniferous System of Tashan Mine,the numerical analysis,similar simulation analysis,site measured statistical analysis,industrial trial and other method were applied to study the key mechanical mining height and top coal caving technology in fully mechanized top coal caving mining technology with the high mining height.The study and practical results showed that under the geological and mining conditions of No.8105 coal mining face in Tashan Mine,the rational mechanized mining height was 4.0~4.3 m,the rational top coal caving step distance was 0.8 m per cutting and caving and the rational top coal caving way was multi round interval sequence and multi window caving.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26